Tripi, full closure of SP 115 lifted
Alternating traffic announced from 14 October through the worksite.
On 13 October the metropolitan authority announced reopening of SP 115 at kilometre 3.500 the following day, using traffic lights and alternating traffic.
Progress on a piled retaining wall allowed the full closure to be lifted after foundation work and removal of drilling equipment.
Pedestrians and vehicles exceeding 18 tonnes remain prohibited in the work area. SP 110 is the stated alternative for heavier vehicles.
Our sources, openly
Città Metropolitana di Messina ↗Sources checked: 5 Nov 2026
Source date: 13 Oct 2026


