A29 Segesta tunnel works bring two-way traffic
The Anas announcement concerns the Trapani-bound carriageway.
On 16 October, TrapaniOggi reported Anas plans for structural and technological work in the Segesta tunnel, in Calatafimi Segesta.
The notice scheduled closure of the Trapani-bound carriageway between kilometres 7.040 and 8.650 from 20 October until 16 January 2027.
Traffic was to use the Alcamo-bound carriageway, with one lane in each direction. This is the timetable announced for that construction phase; subsequent changes require confirmation from the road operator.


